Gyms / Entertainment

K.D. Stahl Construction Project Update | Planet Fitness Otay Ranch by Kraig Stahl

 
 

Planet Fitness of Otay Ranch

We are just a stones throw away from turning this Planet Fitness over to the owners. The last few tiles are being set and the mirrors hung in the restrooms. Gym floor is being laid out and equipment installed while the last few finishes are being checked off the list day by day. Next update we will be showing the final images.

Location: 
2015 Birch Road, Suite 150, Chula Vista CA 91915

 

The Team

Project Manager
David Crafton

Superintendent
Dan Schirmer

 

Architect
DKMullin Architecture
Matt Edwards
517 South Main Street
Moscow, Idaho 83843
T: 208.892.8433
Matt@dkmullin.com

Engineering
Naraghi Engineering
Tom Naraghi
16340 Chaparral Way, Bldg. B
Poway, Ca 92064
T: 
858.435.4877
tomnaraghi@aol.com

Mechanical & Plumbing
Don Penn Consulting Engineer
1301 Solana Bldg. 1, Suite 1420
Westlake, TX 76262
T: 
817.410.2858


Scope:

Tenant Improvement of the previous REI space for a new Planet Fitness gym, A-3 Assembly. The scope includes removal of the existing finishes and fixtures in the space and installation of new walls, finishes, mechanical equipment, ductwork, electrical equipment, new plumbing, and plumbing fixtures.  The scope also includes structural reinforcement of the existing roof for new rooftop mechanical units.


K.D. Stahl Construction Project Update: Planet Fitness by Kraig Stahl

 
 

Planet Fitness of Otay Ranch

The new Planet Fitness is coming along for Otay Ranch - with many people signing up and awaiting its grand opening, we are just waiting on some finishes to arrive and be installed, then it’s time to start laying out the floor plan with the gym equipment. Next update will be the last for this project as we close in on the finish line.

Location: 
2015 Birch Road, Suite 150, Chula Vista CA 91915

 

The Team

Project Manager
David Crafton

Superintendent
Dan Schirmer

 

Architect
DKMullin Architecture
Matt Edwards
517 South Main Street
Moscow, Idaho 83843
T: 208.892.8433
Matt@dkmullin.com

Engineering
Naraghi Engineering
Tom Naraghi
16340 Chaparral Way, Bldg. B
Poway, Ca 92064
T: 
858.435.4877
tomnaraghi@aol.com

Mechanical & Plumbing
Don Penn Consulting Engineer
1301 Solana Bldg. 1, Suite 1420
Westlake, TX 76262
T: 
817.410.2858


Scope:

Tenant Improvement of the previous REI space for a new Planet Fitness gym, A-3 Assembly. The scope includes removal of the existing finishes and fixtures in the space and installation of new walls, finishes, mechanical equipment, ductwork, electrical equipment, new plumbing, and plumbing fixtures.  The scope also includes structural reinforcement of the existing roof for new rooftop mechanical units.


K.D. Stahl Construction Project Update: Planet Fitness by Kraig Stahl

 
 

Planet Fitness of Otay Ranch

With permits approved, the new Planet Fitness is well underway. Framing, mechanical, electrical and plumbing rough-in is complete. Soon we will be completing drywall and will start working on the interior finishes.

Location: 
2015 Birch Road, Suite 150, Chula Vista CA 91915

 

The Team

Project Manager
David Crafton

Superintendent
Dan Schirmer

 

Architect
DKMullin Architecture
Matt Edwards
517 South Main Street
Moscow, Idaho 83843
T: 208.892.8433
Matt@dkmullin.com

Engineering
Naraghi Engineering
Tom Naraghi
16340 Chaparral Way, Bldg. B
Poway, Ca 92064
T: 
858.435.4877
tomnaraghi@aol.com

Mechanical & Plumbing
Don Penn Consulting Engineer
1301 Solana Bldg. 1, Suite 1420
Westlake, TX 76262
T: 
817.410.2858


Scope:

Tenant Improvement of the previous REI space for a new Planet Fitness gym, A-3 Assembly. The scope includes removal of the existing finishes and fixtures in the space and installation of new walls, finishes, mechanical equipment, ductwork, electrical equipment, new plumbing, and plumbing fixtures.  The scope also includes structural reinforcement of the existing roof for new rooftop mechanical units.


K.D. Stahl Construction Group Inc - Ionis Fitness Center Project Update by Kraig Stahl

The Ionis Fitness Center built for Ionis Pharmaceutical is completed and doors are open to the staff of Ionis. 

 
K.D. Stahl Construction Group Inc. - Ionis Fitness Center Ground up Construction

Ionis Pharmaceuticals
Tenant

DGA
Architect

BWE
Structural / Civil Engineer

MPE Engineers
Electrical Engineer

DEC Engineers
Mechanical / Plumbing Engineer

NERI Landscape Architecture 
Landscape Architect

Location:

2855 Gazelle Court
Carlsbad, CA 92010

Scope of Work:

This project consists of the partial demolition of an existing paved parking lot and associated site improvements and the construction of a new one story 5,475 s.f. employee fitness building, outdoor sports court, recreational green space, and associated site improvements.

K.D. Stahl Construction Group Inc. - Ionis Fitness Center
K.D. Stahl Construction Group Inc. - Ionis Fitness Center

Interior finishes 

K.D. Stahl Construction Group Inc. - Ionis Fitness Center
K.D. Stahl Construction Group Inc. - Ionis Fitness Center

Past to Present

K.D. Stahl Construction Group Inc. - Ionis Fitness Center Ground up Construction
K.D. Stahl Construction Group Inc. - Ionis Fitness Center

CMU Walls Stood 

K.D. Stahl Construction Group Inc. - Ionis Fitness Center Ground up Construction
K.D. Stahl Construction Group Inc. - Ionis Fitness Center Ground up Construction
K.D. Stahl Construction Group Inc. - Ionis Fitness Center Ground up Construction

Pre Slab Pour

K.D. Stahl Construction Awarded general contractor of Crunch Fitness Downtown San Diego & Lakeside by Sean Stahl

We are set to begin construction of the new Crunch Fitness gyms in downtown San Diego and Lakeside, California.  

In downtown San Diego, located in a high-rise class A office space this tenant improvement will include 4 floors of high-end gym space including, spin rooms, cardio rooms, weight rooms, and saunas totaling 26,000 SF.  While in Lakeside, this tenant improvement will include the demolition of 14,000 SF of office space and renovating it into another Crunch Fitness Gym.

Both projects are set to begin this month. We will be posting project updates as we move toward completion.