K.D. Stahl Construction Project Update | Planet Fitness Otay Ranch / by Kraig Stahl

 
 

Planet Fitness of Otay Ranch

We are just a stones throw away from turning this Planet Fitness over to the owners. The last few tiles are being set and the mirrors hung in the restrooms. Gym floor is being laid out and equipment installed while the last few finishes are being checked off the list day by day. Next update we will be showing the final images.

Location: 
2015 Birch Road, Suite 150, Chula Vista CA 91915

 

The Team

Project Manager
David Crafton

Superintendent
Dan Schirmer

 

Architect
DKMullin Architecture
Matt Edwards
517 South Main Street
Moscow, Idaho 83843
T: 208.892.8433
Matt@dkmullin.com

Engineering
Naraghi Engineering
Tom Naraghi
16340 Chaparral Way, Bldg. B
Poway, Ca 92064
T: 
858.435.4877
tomnaraghi@aol.com

Mechanical & Plumbing
Don Penn Consulting Engineer
1301 Solana Bldg. 1, Suite 1420
Westlake, TX 76262
T: 
817.410.2858


Scope:

Tenant Improvement of the previous REI space for a new Planet Fitness gym, A-3 Assembly. The scope includes removal of the existing finishes and fixtures in the space and installation of new walls, finishes, mechanical equipment, ductwork, electrical equipment, new plumbing, and plumbing fixtures.  The scope also includes structural reinforcement of the existing roof for new rooftop mechanical units.