Ground Up / Tilt Up

K.D. Stahl Construction Project Update | Millenia Buildings K & L by Sean Stahl

 
 

Millenia Buildings K & L 

Project Update: Building structures are complete and the exterior lathe is underway.

Location: 
2020 & 2030 Birch Road, Chula Vista, CA 91913

 

The Team 

Owner
Sudberry Development Inc.

Architect
AHSA Architects

Construction Management
Randy Bennett

Project Manager
David Crafton

Project Engineer
Yvonne Kline

Project Superintendent
Ysmael Martinez


Scope: New construction of two shell building and site work, Building K is a 3,522 SF single story wood framed building and Building L is a 3,218 Sf single story wood framed building. 

K.D. Stahl Construction Project Update | Millenia Buildings K & L by Sean Stahl

 
 
Screen+Shot+2019-03-19+at+9.29.35+PM.jpg

Millenia Buildings K & L 

Project Update: There is a lot of new development in the works in this neighborhood of Chula Vista with Millenia Buildings K & L being front and center on Birch Road. We have secured this projects’ boundaries, done our soils test, broken ground and now are preparing the footings of these two buildings for their concrete slabs. Next update all underground will be going in and preparation for the slab will be at hand.

Location: 
2020 & 2030 Birch Road, Chula Vista, CA 91913

 

The Team 

Owner
Sudberry Development Inc.

Architect
AHSA Architects

Construction Management
Randy Bennett

Project Manager
David Crafton

Project Engineer
Yvonne Kline

Project Superintendent
Ysmael Martinez


Scope: New construction of two shell building and site work, Building K is a 3,522 SF single story wood framed building and Building L is a 3,218 Sf single story wood framed building. 

K.D. Stahl Construction Project Update: Broadway Apartments by Kraig Stahl

 
 

Broadway Apartments

Framing of the third and final floor is underway. The mechanical, electrical and plumbing is still being roughed in. We’ve got good weather on the calendar so this project will be moving along at a good pace through the rest of spring and summer.

Location: 
2828 Broadway
San Diego, CA 92102

 

The Team

Project Manager
David Crafton

Superintendent
Rob Hirt

 

Architect
Sillman Wright Architects
Brett Tullis AIA LEED AP
7515 Metropolitan Dr. Suite #400
San Diego, CA. 92108
T: 
619.294.7515
btullis@sillmanwright.com

Engineering
Naraghi Engineering
Tom Naraghi
16340 Chaparral Way, Bldg. B
Poway, Ca 92064
T: 
858.435.4877
tomnaraghi@aol.com

Civil
K & S Engineering, INC.
Hossein Zorromodi
7801 Mission Center Court, Suite 100
San Diego, CA 92108
T: 
(619) 296-5565
h-zorromodi@ks-engr.com

Electrical
FARD Engineers
Mike Bowden
3550 Camino del Rio North, Suite 204
San Diego, CA 92108
T: 
(619) 235-0022
mike@fard.com


Scope:

The 34 Multi-family dwelling consists of 20 one bedroom apartments and 14 studio apartments. This apartment building is 3 story above grade and a basement parking structure.


Plumbing
FARD Engineers
Matt Constant
3550 Camino del Rio North, Suite 204
San Diego, CA 92108
T: 
(619) 235-0022
matt@fard.com

Mechanical
FARD Engineers
Bijan Nikravesh
3550 Camino del Rio North, Suite 204
San Diego, CA 92108
T: 
(619) 235-0022
bijan@fard.com

Construction management company
Kirt Gilliland
17898 Corazon Place
San Diego, CA 92127
Mobile
619-977-8046 | Office 619-402-1886
e-mail
kirt@gillilandcm.com

K.D. Stahl Construction Axiom Tustin Clubhouse Project Update by Sean Stahl

Project Update Notes: The exterior framing is complete roof is closed in and we are finally prepping for stucco. The interior plumbing, electrical and mechanical rough in is complete and the drywall is hung and being taped. Skim coat and painting is next for the interior of Axiom Tustin Clubhouse.

 

Axiom Tustin Clubhouse

Location: 
13921 Tustin East Drive
Tustin, Ca 92780

 

The Team 

Owner
RainTree Tustin

Landscape
Mission Landscape Architecture

Civil Engineer
Fuscoe Engineering

Architect
BSB Design

Structural
Core Structure, Inc.

Mechanical & Plumbing Engineer
Alexander Scheflo & Associates, Inc.

Electrical Engineer
Gouvis Engineering Consulting Group, Inc.

Interior Design
CDB Designs

Project Manager
Luke Ninteman

Superintendent
Bob Broadhurst

Scope

These tennis courts are the future site of the Axiom Tustin Clubhouse.  The building will be a ground up 4,200 square foot single story clubhouse and leasing office with high end finishes.  This project also adds a covered patio area with fireplace, a new parking lot and site improvements.


K.D. Stahl Construction Project Update: Broadway Apartments by Kraig Stahl

 
 

Broadway Apartments

Two floors of framing complete and one more to go. The mechanical, electrical and plumbing is well underway.  Weather permitting the third story will soon be standing tall. 

Location: 
2828 Broadway
San Diego, CA 92102

 

The Team

Project Manager
David Crafton

Superintendent
Rob Hirt

 

Architect
Sillman Wright Architects
Brett Tullis AIA LEED AP
7515 Metropolitan Dr. Suite #400
San Diego, CA. 92108
T: 
619.294.7515
btullis@sillmanwright.com

Engineering
Naraghi Engineering
Tom Naraghi
16340 Chaparral Way, Bldg. B
Poway, Ca 92064
T: 
858.435.4877
tomnaraghi@aol.com

Civil
K & S Engineering, INC.
Hossein Zorromodi
7801 Mission Center Court, Suite 100
San Diego, CA 92108
T: 
(619) 296-5565
h-zorromodi@ks-engr.com

Electrical
FARD Engineers
Mike Bowden
3550 Camino del Rio North, Suite 204
San Diego, CA 92108
T: 
(619) 235-0022
mike@fard.com


Scope:

The 34 Multi-family dwelling consists of 20 one bedroom apartments and 14 studio apartments. This apartment building is 3 story above grade and a basement parking structure.


Plumbing
FARD Engineers
Matt Constant
3550 Camino del Rio North, Suite 204
San Diego, CA 92108
T: 
(619) 235-0022
matt@fard.com

Mechanical
FARD Engineers
Bijan Nikravesh
3550 Camino del Rio North, Suite 204
San Diego, CA 92108
T: 
(619) 235-0022
bijan@fard.com

Construction management company
Kirt Gilliland
17898 Corazon Place
San Diego, CA 92127
Mobile
619-977-8046 | Office 619-402-1886
e-mail
kirt@gillilandcm.com

K.D. Stahl Construction Project Update: Broadway Apartments by Kraig Stahl

 
 

Broadway Apartments

Framing of the second floor is almost complete. The next phase for Broadway Apartments will be mechanical, electrical and plumbing rough in.

Location: 
2828 Broadway
San Diego, CA 92102

 

The Team

Project Manager
David Crafton

Superintendent
Rob Hirt

 

Architect
Sillman Wright Architects
Brett Tullis AIA LEED AP
7515 Metropolitan Dr. Suite #400
San Diego, CA. 92108
T: 
619.294.7515
btullis@sillmanwright.com

Engineering
Naraghi Engineering
Tom Naraghi
16340 Chaparral Way, Bldg. B
Poway, Ca 92064
T: 
858.435.4877
tomnaraghi@aol.com

Civil
K & S Engineering, INC.
Hossein Zorromodi
7801 Mission Center Court, Suite 100
San Diego, CA 92108
T: 
(619) 296-5565
h-zorromodi@ks-engr.com

Electrical
FARD Engineers
Mike Bowden
3550 Camino del Rio North, Suite 204
San Diego, CA 92108
T: 
(619) 235-0022
mike@fard.com


Scope:

The 34 Multi-family dwelling consists of 20 one bedroom apartments and 14 studio apartments. This apartment building is 3 story above grade and a basement parking structure.


Plumbing
FARD Engineers
Matt Constant
3550 Camino del Rio North, Suite 204
San Diego, CA 92108
T: 
(619) 235-0022
matt@fard.com

Mechanical
FARD Engineers
Bijan Nikravesh
3550 Camino del Rio North, Suite 204
San Diego, CA 92108
T: 
(619) 235-0022
bijan@fard.com

Construction management company
Kirt Gilliland
17898 Corazon Place
San Diego, CA 92127
Mobile
619-977-8046 | Office 619-402-1886
e-mail
kirt@gillilandcm.com

K.D. Stahl Construction Axiom Tustin Clubhouse Project Update by Sean Stahl

The concrete slab has been poured and the framing of the clubhouse and leasing office has begun for the Axiom Tustin Apartments.

 

Axiom Tustin Clubhouse

Location: 
13921 Tustin East Drive
Tustin, Ca 92780

 

The Team 

Owner
RainTree Tustin

Landscape
Mission Landscape Architecture

Civil Engineer
Fuscoe Engineering

Architect
BSB Design

Structural
Core Structure, Inc.

Mechanical & Plumbing Engineer
Alexander Scheflo & Associates, Inc.

Electrical Engineer
Gouvis Engineering Consulting Group, Inc.

Interior Design
CDB Designs

Project Manager
Luke Ninteman

Superintendent
Bob Broadhurst

Scope

These tennis courts are the future site of the Axiom Tustin Clubhouse.  The building will be a ground up 4,200 square foot single story clubhouse and leasing office with high end finishes.  This project also adds a covered patio area with fireplace, a new parking lot and site improvements.


K.D. Stahl Construction Group Inc. Project Update - Grand Opening of Bedrosian Tile & Stone Showroom by Sean Stahl

The new 30,000 sq.ft. Bedrosian Tile & Stone showroom and warehouse is officially open for business. It was a privilege attending their grand opening and seeing the building full of product and displays.

K.D. Stahl Construction Group Inc. San Diego's Leading Commercial General Contractor - Bedrosian Tile & Stone Ground up New Construction

Bedrosian Tile & Stone
Tenant

Gensler
Architect

Dan Dickey
Project Manager

Chris Cherry
Superintendent

Scope of Work:

The new construction project will entail a 30,000 Sq.Ft. tilt-up building, with 6,500 Sq. Ft. of showroom, offices, and site work.

K.D. Stahl Construction Group Inc. San Diego's Leading Commercial General Contractor - Bedrosian Tile & Stone Ground up New Construction
K.D. Stahl Construction Group Inc. - Bedrosian Tile & Stone Ground up New Construction
K.D. Stahl Construction - Bedrosian Tile & Stone
K.D. Stahl Construction - Bedrosian Tile & Stone