K.D. Stahl Construction Project Update: Planet Fitness
Planet Fitness of Otay Ranch
With permits approved, the new Planet Fitness is well underway. Framing, mechanical, electrical and plumbing rough-in is complete. Soon we will be completing drywall and will start working on the interior finishes.
Location:
2015 Birch Road, Suite 150, Chula Vista CA 91915
The Team
Project Manager
David Crafton
Superintendent
Dan Schirmer
Architect
DKMullin Architecture
Matt Edwards
517 South Main Street
Moscow, Idaho 83843
T: 208.892.8433
Matt@dkmullin.com
Engineering
Naraghi Engineering
Tom Naraghi
16340 Chaparral Way, Bldg. B
Poway, Ca 92064
T: 858.435.4877
tomnaraghi@aol.com
Mechanical & Plumbing
Don Penn Consulting Engineer
1301 Solana Bldg. 1, Suite 1420
Westlake, TX 76262
T: 817.410.2858
Scope:
Tenant Improvement of the previous REI space for a new Planet Fitness gym, A-3 Assembly. The scope includes removal of the existing finishes and fixtures in the space and installation of new walls, finishes, mechanical equipment, ductwork, electrical equipment, new plumbing, and plumbing fixtures. The scope also includes structural reinforcement of the existing roof for new rooftop mechanical units.