Broadway Apartments

Framing of the second floor is almost complete. The next phase for Broadway Apartments will be mechanical, electrical and plumbing rough in.

Location: 
2828 Broadway
San Diego, CA 92102

The Team

Project Manager
David Crafton

Superintendent
Rob Hirt

Architect
Sillman Wright Architects
Brett Tullis AIA LEED AP
7515 Metropolitan Dr. Suite #400
San Diego, CA. 92108
T: 
619.294.7515
btullis@sillmanwright.com

Engineering
Naraghi Engineering
Tom Naraghi
16340 Chaparral Way, Bldg. B
Poway, Ca 92064
T: 
858.435.4877
tomnaraghi@aol.com

Civil
K & S Engineering, INC.
Hossein Zorromodi
7801 Mission Center Court, Suite 100
San Diego, CA 92108
T: 
(619) 296-5565
h-zorromodi@ks-engr.com

Electrical
FARD Engineers
Mike Bowden
3550 Camino del Rio North, Suite 204
San Diego, CA 92108
T: 
(619) 235-0022
mike@fard.com


Scope:

The 34 Multi-family dwelling consists of 20 one bedroom apartments and 14 studio apartments. This apartment building is 3 story above grade and a basement parking structure.


Plumbing
FARD Engineers
Matt Constant
3550 Camino del Rio North, Suite 204
San Diego, CA 92108
T: 
(619) 235-0022
matt@fard.com

Mechanical
FARD Engineers
Bijan Nikravesh
3550 Camino del Rio North, Suite 204
San Diego, CA 92108
T: 
(619) 235-0022
bijan@fard.com

Construction management company
Kirt Gilliland
17898 Corazon Place
San Diego, CA 92127
Mobile
619-977-8046 | Office 619-402-1886
e-mail
kirt@gillilandcm.com