K.D. Stahl Construction Group Inc.

View Original

K.D. Stahl Construction Project Update: Broadway Apartments Standing Walls

Location: 
2828 Broadway
San Diego, CA 92102

Broadway Apartments

The CMU wall footings were poured and walls built up to the top of the garage level. Structural pillar footings have been poured and the pillars are being framed in preparation for concrete. 

The Team

Project Manager
Kraig Stahl

Superintendent
Bill Shepard

Architect
Sillman Wright Architects
Brett Tullis AIA LEED AP
7515 Metropolitan Dr. Suite #400
San Diego, CA. 92108
T: 619.294.7515
btullis@sillmanwright.com

Engineering
Naraghi Engineering
Tom Naraghi
16340 Chaparral Way, Bldg. B
Poway, Ca 92064
T: 858.435.4877
tomnaraghi@aol.com

Civil
K & S Engineering, INC.
Hossein Zorromodi
7801 Mission Center Court, Suite 100
San Diego, CA 92108
T: (619) 296-5565
h-zorromodi@ks-engr.com

Electrical
FARD Engineers
Mike Bowden
3550 Camino del Rio North, Suite 204
San Diego, CA 92108
T: (619) 235-0022
mike@fard.com


Scope:

The 34 Multi-family dwelling consists of 20 one bedroom apartments and 14 studio apartments. This apartment building is 3 story above grade and a basement parking structure.


Plumbing
FARD Engineers
Matt Constant
3550 Camino del Rio North, Suite 204
San Diego, CA 92108
T: (619) 235-0022
matt@fard.com

Mechanical
FARD Engineers
Bijan Nikravesh
3550 Camino del Rio North, Suite 204
San Diego, CA 92108
T: (619) 235-0022
bijan@fard.com

Construction management company
Kirt Gilliland
17898 Corazon Place
San Diego, CA 92127
Mobile 619-977-8046 | Office 619-402-1886
e-mail kirt@gillilandcm.com